Monday, April 25, 2011

GAP To Get Facelift


Construction on a slate of pedestrian and bike improvements for Grand Army Plaza is scheduled to move forward this summer, NYC DOT announced this Saturday. The redesign includes a major expansion of the pedestrian islands at the north side of GAP and the addition of a two-way, protected bicycle connection linking Union Street to Eastern Parkway on the southern side. It does not include the two-way, protected bike lane on Plaza Street shown in DOT’s 2010 presentation on this same project, which Community Boards 6 and 8 both approved last year.

No comments:

Post a Comment